data: xt001w type t001w.
data: duration type i.
data: sdate type sy-datum.
data: edate type sy-datum.
* Get the factory calendar for specific plant
select single * from t001w into xt001w
where werks = '0004'. " Use your plant
* Set start/end dates
sdate = sy-datum.
edate = sy-datum + 30.
call function 'DURATION_DETERMINE'
exporting
factory_calendar = xt001w-fabkl
importing
duration = duration " In days
changing
start_date = sdate
end_date = edate
exceptions
factory_calendar_not_found = 1
date_out_of_calendar_range = 2
date_not_valid = 3
unit_conversion_error = 4
si_unit_missing = 5
parameters_not_valid = 6
others = 7.
write:/ duration.